It rises in winter of Kitami and plans

November 18, 2019

■Kitami autonomous district

Kitami autonomous district is equivalent to round-trip distance from Kitami-shi to Hakodate-shiRequest

Citizen alone, understanding of one and cooperation are necessary.

Kitami autonomous district has the snow removing line of 1,221.6km.

This is equivalent to round-trip distance from Kitami-shi to Hakodate-shi.

We clear these enormous distance of snow by 118 snowplows,

We need citizen alone, understanding of one and cooperation to aim at comfortable winter living by security.

 

1.Let's perform the snow removing of doorway in each family.

2.Let's stop on-the-street parking. 

3.Let's leave that we bring garbage into snow sedimentation ground.

4.Let's stop getting out snow to road.

5.It will prevent you from putting thing on road and the sidewalk.

6.On snowplow, please never approach. 

About the snow removing [PDF: 390KB]

The snow removing summary

The snow removing of the snow removing extension city street

Type of the snow removing road Explanation of road Extension Method of the snow removing
Road Highway Main highways where it is bus traffic line and commuting road, and there is particularly much traffic 43.4km
Local distributor Road with role to let traffic of highway meet and part with function to supplement main line in district 67.1km
Other roads Community roads 839.8km
The sidewalk 271.3km

Corresponding snowplow

Corresponding snowplow・102 road snowplows

・16 sidewalk snowplows

・Kitami autonomous district snow removing total extension 1,221.6km

・Snow removing extension about 10km per one

 

 

It usually supports the snow removing of time

  • Criterion

1.When the snow-removal work is necessary for approximately consecutive snowfall by patrol more than snow deep ga 10cm.

2.When outbreak of hangout for dropouts by wind and snow or drifting snow is expected.

  • Correspondence

1.We try to clear of snow by commuting, attending school.

It supports the snow removing at the time of heavy snowfall

  • Criterion

1.When snowfall is expected with 50-70cm

2.When it is in a condition not to be able to do the snow-removal work, and it is anticipated that this considerably follows at time by drifting snow or strong snowfall

3.When suspension of traffic occurs by the snow

4.When the snow removing is almost estimated to be completion within two days

  • Correspondence

1.We give priority to highway, local distributor and clear of snow sequentially

It supports the snow removing at the time of disaster

It supports the snow removing at the time of disaster

 

 

 

 

 

 

 

  • Criterion

1.Of the large-scale snow damage that quantity of snow is anticipated 70cm or more when might occur, and the measures are necessary

2.When it is anticipated for the snow removing more than three days

  • Correspondence

1.We give priority to highway, local distributor and clear of snow sequentially.

2.We establish antidisaster headquarter and try for ensuring safety of citizen's everybody.

 

The snow removing data

Lists such as the snow removing vehicles

Contact

Road Administration Division
telephone: 0157-24-9311